Google 1265 Borregas Won ENR’s Global Best Projects Award: Green Project
The XL, SERA, and MGA design-build team was thoughtfully assembled by Google, bringing together international thought leaders with a proven ability to collaborate and function as one team. This team set a new standard for biophilic and structural design, construction techniques, material sourcing, and carbon reduction using mass timber. As Google’s first ground-up building constructed from sustainable mass timber material, the project is a high-performance, low carbon building that showcases both sustainable architecture and innovative workplace design.